Reconstruction of the main circuit of Kazan TPS-2

 

For uninterrupted and reliable power supply for Kazan consumers, it was the main circuit of Kazan TPS-2 was reconstructed. The reconstruction included:

• Reconstruction of OSG-35 with replacement of cells at 35 kV to 110 kV cells with the installation of gas-insulated switches VEB-110-2000-50;
• reconstruction of two 35 kV overhead line of Substation "Leninskaya" on the 110 kV XLPE;
• reconstruction of differential bus protection-110 with installation of new panels.

Group members: "TatNIPIenergoprom", Engineering Centre Energoprogress , "KER-Avtomatika", "KER-Naladka"