The reconstruction of the electrotechnical equipment

 

Full reference of electrotechnical direction (download)  

 

A brief reference of electrotechnical direction:

 

Customer and object name

Project description

Implementation period

Elabuga electrical networks
substation construction of a new generation "Schelokovo-500" in the Republic of Tatarstan

2011-2013

Kazan electric networks
Reconstruction of substation 500 kV "Kinderi"

2011-2013

Nizhnekamsk electrical network installation and commissioning works: "Reconstruction of the SS "Nizhnekamsk" (replacement of 220 kV cell Kutlu-Bukash)" Nizhnekamsk

2013

Kazan TPS-3(branch of JSC "TGC-16") installation and commissioning works: "The main switchgear 110 kV. Construction of the bus coupler section 3.4 of ORU-110 "

2013

Branch "Vladimirenergo"

 

JSC "IDGC of Center and Volga Region"

complex commissioning and testing of equipment of 110/6/6 kV Substation "Semyazino" in Vladimir

2013

Nizhnekamsk HPS Modernization of the central regulator of pressure hydraulic generators № 1-16

2012

Nizhnekamsk HPS Design and research works “Modernization of generator circuit breakers VVG-20 with the replacement of relay protection unit (HA 13-16)”

2012

Zainsk SDPS

construction, installation and commissioning works: Modernization of turbine unit st.№12 with the replacement of the turbine generator retaining rings, brush-contact apparatus and systems of thyristor excitation

2012

Almetyevsk electrical networks arc protection devices on Substation “Industrial”

2011

Bugulma electrical network equipment arch protection of control and switchgear 6-10 kV Substation “Bavly”

2011

Kazan TPS-1 turbine at Station # 7. Modernization of the generator rotor retaining rings and cooler

2011

Kazan TPS-1 110 kV indoor switchgear. Modernization of bypass, and bus line disconnectors

2011

Kazan TPS-2 Reconstruction of Kazan TPS-2 with installation of CCP. (Stage 1) Reconstruction of the scheme S. 4.4 and 3.15 kV

2011

Zainsk SDPS Turbine unit st.№12. Modernization of turbo-generator with the replacement of retaining rings, brush-contact apparatus and systems of thyristor excitation

2011

Kazan TPS-3
Implementation of the gas turbo-expander gas pipeline SRC-2. Power supply.

2011

Nizhnekamsk TPS (PTC 1) Installation of compressors VSV instead of 3/100 compressor VSHZ-3/40 ZRU-110

2011

Bugulma electrical networks Reconstruction of open switchgear -220 kV 220/110/35/6 kV "Pismyanka" Construction of 2 chain 220 kV overhead line (cutting 220 kV "nodes Abdrakhmanovo-Bugulma" the factory of the SS "Pismyanka" ) for power supply electro plant JSC "Tatstal."

2011

Buinsk electric networks arc protection network equipment 6-10 kV switchgear of 110 kV Substation "Tarkhany", "Kaybitsy", "Sunrise", “Nizhniy Uslon”

2011

Naberezhnye Chelny electrical network
equipment arch protection of closed switchgear 6-10 EMG-86

2011

Naberezhnye Chelny Electric Networks RF processing 110 kV CSC-ZaySDPS 1,2 c.

2011

Kazan TPS-1 Hardware Upgrades of main switchgear-6 kV №2 power equipment and water heating boiler station

2010

Kazan electrical networks Reconstruction of SS "Central", SS "Southern" with the installation of the apparatus of the CCP-C (design, installation, commissioning)

2010

Moscow TPP-23 Reconstruction of electrotechnical equipment of power stations (switches): "Replacement of 220 kV circuit breakers" 296 "block №6 on the replacement of gas-insulated disconnectors (Moscow TPP-23)

2010

 

JSC "Sealtek"
Reconstruction of excitation system«UNITROL 1000" turbogenerators TG-1 and TG-2

2010

JSC "TGC-16" Modernization of generator of GSP-900-1000-94, improvement of excitation system backup exciter №1

2010

JSC "TGC-16" Modernization of 110 kV indoor switchgear with the installation of gas-insulated breakers and microprocessor protection cells №9, 10, disconnectors, current transformers cell №36 (PTC 1) (2 launch complex - cell №10, 3 launch complex - cell №36)

2010

JSC "TGC-6" Installation of single-phase protection against short circuits on the side of blocks 6, 7, 8 GT for the needs of Penza branch of JSC "Territorial Generating Company №6» (design, installation, adjustment)

2010

Chistopol EN
Upgrade of 110/35/10 kV "Nurlat-Novaya" with overhangs of 110-35-10 kV

2010

JSC "VKiEH" Reconstruction of power equipment chambers KSO-10 kV KNS-10 (design, installation, commissioning)

2010

Zainsk SDPS
Modernization of turbogenerators # 2, 3, 5-12, with the introduction of a system of registration of partial discharges in the stator winding

2010

Naberezhnye Chelny TPS Modernization of 110 kV outdoor switchgear including the replacement of circuit breakers with gas-insulated ones with microprocessor protection (Cell #. №1, №2, №4)

2010

Volga electrical network reconstruction of Arpt existing 220 kV overhead line at Substation "Kinderi" and perform Arpt 220 kV on the SS "Zelenodolskaya" (design, installation, commissioning)

2010

Kazan electrical networks
Reconstruction of equipment of OSG 500 kV Substation "Kinderi" with replacement of the CT-500 kV (design, installation, commissioning)

2010


110 kV Substation "Zapadnaya"
Reconstruction of 110 kV substations including the replacement of circuit breakers. Equipment arc protection. Implementation of the system of collecting technological information.

2009

110 kV Substation "Iskozh",110 kV Substation "Peace", 110 kV Substation "Mamadysh", 110 kV Substation "Arsk" ,110 kV Substation "Vasilyevo" ,110 kV Substation "Sarsazy", 110 kV Substation "Lenino" Reconstruction of substations. Equipment arc protection

2009

Nizhnekamsk HPS Design and survery works of modernization of generator circuit breakers VVG-20 with the replacement of relay protection unit (GA1-4)

2009

Naberezhnye Chelny TPS Modernization of equipment at 110 kV outdoor switchgear (OSG compressor)

2009

Nizhnekamsk TPS Modernization of 110 kV outdoor switchgear with the installation of measuring current and coupling capacitors

2009

SS "Nizhnekamsk" Reconstruction of 110 kV outdoor switchgear

2009

SS "Zavodskaya", SS “Uzlovaya” reconstruction (extension) 220 kV outdoor switchgear

2009

Naberezhnye Chelny TPS Reconstruction of 6 kV switchgear assembly sections 7RA, AB

2009

Naberezhnye Chelny TPS modernization of electrical equipment of the power of the main body, RPA control and switchgear-6 kW, sections 2pa, AB

2009

Kazan TPS-3
modernization of the generator of TVF-120-2 # 4 (set of bandage and centering rings of corrosion steel, partial discharge sensors, dual-channel regulator AVR excitation system)

2009

Kazan TPS-1 Upgrade of main control unit with automatic discharge KTETs-1 to the load area and the units for their own needs

2009

SS "Bugulma-500 kV “Reconstruction of DC board. Selective search system from the fault”.

2009

Naberezhnye Chelny TPS modernization of electrical equipment of the power of the main building with the installation of circuit breakers and relay protection and automation tools RUSN 0.4 Section 1 NO

2009

Zainsk SDPS Reconstruction of 6 kV switchgear assembly unit st.№10 (15 cells, №1,3,4,5,6,7,8,9,10,12,15,19,20,22,23)

2009

Zainsk SDPS Modernization of 6 kV switchgear assembly with the introduction of arc protection (1 start complex)

2009

SS "Bugulma -110" SS "Kargaev" The introduction of the emergency recording settings RPA and emergency control

2009

Kazan TPS-3 retrofitted sections KRU-6kV auxiliary power arc protection

2009

Kazan TPS-3 modernization of Transformator T-4

2009

Naberezhnye Chelny TPS Reconstruction of DC board №2

2009

Kazan TPS-1
Hardware Upgrades switchgear-6 kV №2 power equipment and water heating boiler station

2009

Kazan TPS-1 Modernization U-5053 automatic load shedding (ACR)

2009

Kazan TPS-3 Reconstruction of nutrient pumps st.№2,4,5 with the installation of new electric motors 4 AZM

2009

Zainsk SDPS Modernization of DC board unit №5, 6, 9, 10 with the replacement of the battery

2009

Nizhnekamsk TPS Modernization of the transformer TDC-125000-121-10.05 №6. Improvement of measuring current.

2009

Zainsk SDPS Modernization of turbine generators st.№2,3,5-12. and implementation of the registration of partial discharges in winding startora. Implementation of protection against earth fault in the winding startora.

2009

Kazan TPS-3 retrofitted turbine units of TG-3, TG-5, TG-6 sensors PD

2009

Nizhnekamsk TPS Implementing protection against ground faults in the circuits startor turbogenerators

2009

Kazan TPS-2 Arc protection sections 6 kV peak water heating boiler station

2009

The site of the SS "Southern" SS "Iskozh" Substation "Volga"

(Volga Electric Networks)

Organization of digital channels of fiber optic link

2009

110 kV overhead line "Setyakovo-Chekalda" 35 kV overhead line "Chekalda-Kuchukovo" Connecting the 110 kV overhead line "Setyakovo-Chekalda" through the repair bridge. Connecting the 35 kV overhead line "Chekalda-Kuchukovo"

2009

35 kV overhead line "Derbyshki-Makarovka" SS35/10 kV "Makarovka" Designing of communications reconstruction of 35 kV "Derbyshki-Makarovka" with transfer to 110 kV voltage, the reconstruction of 35/10 kV Substation "Makarovka" translation circuit 110/35 / 10kV and rearrangement of entries VL-110 and 35 kV substations reconstructed.

2009

110 kV overhead line "South-Covali 1.2

"Reconstruction of 110 kV overhead line. Equipment of the HV-speed microprocessor-based protection.

2009

500 kV substation "Kinderi" 110 kV Substation "high mountain" VL110kV "Kinderi - Arsk" Selecting frequency RF communication channel 500 kV substation "Kinder" - 110 kV Substation "high mountain" in the apparatus 600 for ETL VL110kV "Kinder - Arsk" for the project of reconstruction

2009

Nizhnekamsk HPS Modernization of generator circuit breakers VVG-20 with the replacement of relay protection unit (CA-5-8)

2009

Pumping station 4 in Naberezhnye Chelny Reconstruction of electrical part

2009

110 kV substations: Kargali, Bugulma 14, Southern, Western and others. Monitoring devices RPA and emergency control systems with data transmission system operator of emergency events (design, installation, commissioning)

2009

TPS-17, Moscow, TPS-23, Moscow Reconstruction of generator commissioning of thyristor excitation, generator protection, transformer HF sections of control and switchgear-6kV

2008

Group members: "TatNIPIenergoprom", Engineering Centre Energoprogress , "KER-Avtomatika", "KER-Naladka"