The construction design and supervision

Download file Reference list for the design and construction support

The main work carried out in 2013-14.

Upgrade of 500 kV substation Kinderi with dismantling of the existing equipment, the third branch

"Network Company" Kazan electrical networks

TI transfer of active power waterline on substation Kinderi emergency control on the capital construction object: "Construction of cable and overhead transmission line of 220 kV Central - K.Bukash followed by dismantling of a section of 220 kV Kinderi - K.Bukash with suspension VOLS

Branch of JSC" Network Company " Kazan electrical networks

Design and survey work on the project of capital construction "Reconstruction of 110/10 kV Substation "Osinovo "

JSC "SREDNEVOLZHSKSELELEKTROSETSTROY"

Design work for the Kazan electrical networks

JSC "SREDNEVOLZHSKSELELEKTROSETSTROY"

Design and survey work on the development of project (PD) and working (WD) documentation for the project of capital construction "Reconstruction of 500 kV Zay SDPS -Kinderi with the replacement of ground wire"

Branch of JSC "Network Company" Kazan electrical networks

Design and survey work on the project of capital construction “Reconstruction of 110 kV overhead line” TPS-3 Site Z I, II”

Branch of JSC "Network Company “Volga Electric Networks”

Design and survey work on the grid connection project: "Construction of 110 kV cell at 110/10 OPH to connect the emergency repair of 110 kV at Substation -28 Korobkovo NGDU "Bavlyneft"

Branch of JSC "Network Company" Bugulma electrical networks

PD and WD for "Reconstruction of the Substation 500 Kinderi "Engineering and technical means of protection"

LLC "Security company "Energoshchit-K"

Design and survey work on the project of capital construction "Reconstruction of 110/6 kV BSI"

Branch of JSC "Network Company" Naberezhnye Chelny electrical networks

"Conceptual design development of the project on power output in GTU-1,2,3 of “Plant MDF, particleboard and OSB" in the SEZ "Alabuga";

- Adjustment of work by the title of 00,097 "conceptual development of the project on power output in GTU-1,2,3of  “Plant MDF, particleboard and OSB" in the SEZ "Alabuga" - LLC "Kastamonu Integrated Wood Industry"

LLC "Kastamonu Integrated Wood Industry"

R & D for "Relay shield of the main building. Modernization of protections of 110 kV using gas-insulated VT-110 kV and 110 kV.  Mounting of transfer trip backup channel (UPKTS)"

JSC "TGC-16" NkTPP (PTC 1)

Calculation of relay protection and automation mounting of the project 220 kV Yelabuga 500 -TANEKO

LLC «INVENT-Tekhnostroy"

Innovation center "Innopolis" energy supply concept development

JSC "Kazan GIPRONIIaviaprom"

Transition of 220 kV Kama-500-Complex across the Kama river

LLC «INVENT-Tekhnostroy"

Construction of facilities for electricity generation using turbines. Cable line 220 kV from units 6.7 to switchgear - 220 TANECO  JSC "The Urals Energy Engineering Center"
Construction of design waterline 110 kV aerial cable Svijazhsk-Innopolis KVL 110 kV Isakovo-Innopolis
Branch of JSC "Network Company" Buinsk Electric Networks
Construction of design waterline 220 kW 1.2-chain Yelabuga -500-Central  Branch of JSC "Network Company" Elabuga Electric Networks

Development of power supply for KGPTO JSC "TAIF-NK"

JSC "TAIF-NK"
External power supply circuit of phase 2 "for the production of sapphires for optoelectronics" LLC "KamaCristalTehnology"
Construction of waterline 110 kV Substation Toima-2 RP-1 of the SEZ "Alabuga" 1.2 chain Branch of JSC "Network Company" Elabuga Electric Networks

Automatic modular boiler house under the project of the first starting complex engineering networks of the SEZ "Innopolis"

Closed Joint Stock Company "Kazan GIPRONIIAVIAPROM"
"The main step-down substation 110/10 kV "Innopolis" on the territory of Verkhneuslonsky district, Republic of Tatarstan  Joint Stock Company "Elektroshchit"

"Modernization of communication channels" for the branch of JSC "Network Company" Buinsk electric networks

Branch of JSC "Network Company" Buinsk Electric Networks

"External power supply for deep conversion of heavy residues (KGPTO) JSC "TAIF-NK"

Open Joint Stock Company "TAIF-NK"
"Installation of limiting reactors at the 110 kV overhead line from 1.2 Nizhnekamsk TPS-1" JSC "Nizhnekamskneftekhim"
"Upgrade of 110 kV Substation Kirov" (design estimates correction) 

Branch of JSC "Network Company" Kazan electrical networks

Object 1 - "Distribution network of 10 kV power supply for JSC "SEZ "Innopolis"

Object 2 - "Switchgear 10 kV and the system of operative DC GLP Innopolis»

LLC «INVENT-Electro"
"Construction of a power generation capacity with low-grade steam turbines in Nizhnekamsk. Modernization of turbine generators №4, 5, with the replacement of relay protection and automation for microprocessor protection and automation devices and the replacement of the excitation system of generator for excitation system with automatic regulator of strong action"  JSC "The Urals Energy Engineering Center"
"Gas distribution point №3 with gas pipelines. Reconstruction of the scheme of fuel gas in the boilers of Nizhnekamsk TPS (PTC 1) of KGPTO JSC "TAIF-NK"  JSC "TGC-16"

Design and survey works "Construction of 220 kV aerial cable Kama Taneco"

LLC Management Company "KER-Holding"
Design and survey works "Construction of 220 kV aerial cable Shchelokovo-Kama" LLC Management Company "KER-Holding"
Design and survey works "Construction of the SS 220/110 / 10kV Kama  LLC Management Company "KER-Holding"

 

The main work carried out in 2012

Work name

Customer

JSC "Generation Company"

The boiler unit at Station № 7. Modernization of gas boiler with the introduction of automatic ignition burners   Branch of JSC "Generation Company" Zainsk SDPS

Services for the preparation of the project and working documentation for state expert examination of the object "Reconstruction of the retaining walls of the downstream spillway dam of Zainsk SDPS "
Branch of JSC "Generation Company" Zainsk SDPS


"Additional equipment of black oil tanks of steel (V = 10 000m3) with the installation of a stationary cooling system"

Branch of JSC "Generation Company" Kazan TPS-1
Boiler “Savinovo” checkpoint reconstruction Branch of JSC "Generation Company" Kazan TPS-2
Design work on the project: "Boiler room "Savinovo". Storm sewage"  Branch of JSC "Generation Company" Kazan TPS-2
Creation of design estimates for the project: "boiler unit of the station №8. Upgrading with the introduction of the ignition gas units "Amax"
Branch of JSC "Generation Company" Kazan TPS-2

development of working documentation for the project: Naberezhnye Chelny TPS "Modernization of fixed electrolysis plant"

Branch of JSC "Generation Company" Naberezhnye Chelny TPS

Modernization of boiler TGM-84 B " station № 8 with the installation of gas blocks “AMAKS”

Branch of JSC "Generation Company" Naberezhnye Chelny TPS
development of working documentation for the project: Naberezhnye Chelny TPS "Modernization of boiler TGME-464 stations № 13.14 with the introduction of “AMAX”  Branch of JSC "Generation Company" Naberezhnye Chelny TPS
Modernization of high-pressure pipelines (main steam) t / u st. № 7,8 K / A st. № 7,8  Branch of JSC "Generation Company" Naberezhnye Chelny TPS
processing on power shortages and problems with providing Kazan consumers with electrical energy to the state of 2012 with the outlook for 2018  JSC "Generation Company"
JSC "Network Company"
design work on the project of capital construction "Equipping with high-speed HF protection of 220 kV Zainsk sites 1,2"
Branch of JSC "Network Company" Almetyevsk electrical networks
Equipping with arch protection of complete switchgear-6 kW substation 35 Bigashevo
Branch of JSC "Network Company" Almetyevsk electrical networks
Correction of design and working documentation for the substation Bugulma 500. Reconstruction of 110 kV outdoor switchgear (5 cells) Branch of JSC "Network Company" Bugulma electrical networks
Correction of design and working documentation for the substation Bugulma 500. Reconstruction of 220 kV outdoor switchgear (3 cells) Branch of JSC "Network Company" Bugulma electrical networks
Removal of origin in nature for 110 kV Substation № 41 "Konogorovka"  Branch of JSC "Network Company" Bugulma electrical networks
Design and detailed documentation "Reconstruction  of emergency control of  SS "Bugulma 500 kV "(ntroduction AOPO gr. 2 AT, gr.AT) Branch of JSC "Network Company" Bugulma electrical networks
Design and survey work on the project: "Upgrade of substation Kinderi. Reconstruction of the RF channel 220 kV Kinderi TPS-3"
Branch of JSC "Network Company" Kazan electrical networks
Implementation of design - survey work on the distribution network projects for the needs of JSC "Grid Company" - Nizhnekamsk Electric Networks:
- "Reconstruction of 0.4 kV overhead lines including the replacement of 0.4 kV insulated on from KTP № 420 and № 690 settlement T. Suksy, Aktanysh region";
- "Reconstruction of 0.4 kV overhead lines including the replacement of 0.4 kV insulated on from KTP №1159, KTP № 161 Substation Broiler F-5 in the settlement Balchikly, Nizhnekamsk area";
- "Reconstruction of 0.4 kV overhead lines including the replacement of 0.4 kV insulated on from TP № 523 F-13 in the territory of the market complex in Zainsk";
- "Reconstruction of 0.4 kV overhead lines including the replacement of 0.4 kV insulated on from KTP № 45 / 160kVa, KTP №34 / PS 160kVa Matveevka F-7 NP v. Aleksandrovka, Menzelinsky area";
- "Reconstruction of 10 kV overhead lines including the replacement of 10 kV cable line on the line F-1, F-9 Aktanysh substations, replacement of CTS №49 / 160kVa on ETC 1 * 160 NP Aktanysh";
- " Reconstruction of 6 kV overhead lines with replacement of 6 kV cable line on the line F-5 PS Ilbuhtino in flight № 144-149 bp Ilbuhtino"
Branch of JSC "Network Company" Nizhnekamsk Electric Networks
design and survey works on the capital construction object "Construction of the overhead line 220 kV Central-K.Bukash with the reconstruction of 220 kV Central Kinderi - K.Bukash followed by dismantling of a section of 220 kV Central Kinderi -K.Bukash and suspension VOLS" Branch of JSC "Network Company" Privolzhskie Electric Networks
design and survey works on the projects:
- "Reconstruction of 0.4 kV overhead line from KTP-4021 f.№1 settlement Belo-Bezvodnoe, Zelenodolsk District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from Transformer Substation 69 Substation f.№2 Wave settlement Zelenodolsk, Zelenodolsk
District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from Transformer Substation 57 Substation f.№14 Zelenodolskaya, settlement Zelenodolsk,
Zelenodolsk District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from complete transformer substation-3294 settlement Aybash, Vysokogorsky District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from complete transformer substation-3296 settlement Aybash, Vysokogorsky District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from f.№6 transformer substation 10 substation Zelenodolskaya settlement Zelenodolsk
Zelenodolsk District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from Transformer Substation 48 Substation f.№17 Zelenodolskaya, settlement Zelenodolsk
Zelenodolsk District of Tatarstan "
- "Reconstruction of 0.4 kV overhead line from Transformer Substation 20 Substation f.№2 Zelenodolskaya, settlement Zelenodolsk, Zelenodolsk District of Tatarstan"
Branch of JSC "Network Company" Volga Electric Networks
Design and survey work: "Replacement of isolating switches, 220 kV of cell AT-2 on the 220 kV gas-insulated circuit breaker with reconstruction of RPD AT-2 and back-up protection of 220 kV Nizhnekamsk - K.Bukash overhead line at 220 kV substation Nizhnekamsk and 220 kV substation K.Bukash" Branch of JSC" Network Company" Volga Electric Networks
engineering and surveying services: "The wires vertical dimension of overhead line check in the substation "Konogorovka" Branch of JSC" Network Company “Bugulma electrical networks”
"Construction of cable and overhead transmission line 220 kV Central - K.Bukash followed by dismantling of a section of 220 kV Kinderi - K.Bukash with suspension VOLS"
Branch of JSC "Network Company" "Kazan electrical networks"

ПИР «Замена защиты АТ-2, АПВ, АУВ, УРОВ выключателя 220 кВ АТ-2 с использованием существующих электромеханических устройств»

Филиала ОАО «Сетевая компания» Приволжские электрические сети

Design and survey works "Replacing of protection AT-2, AR, AH, circuit breaker, failure protection switch 220 kV AT-2 with existing electromechanical devices" Branch of JSC "Network Company" Volga Electric Networks
Design and survey works "Reconstruction of the substation "Nizhnekamsk "cell of 220 kV overhead line "Nizhnekamsk-K-Bukash" and relay protection and automation devices and supervisory control system of 220 kV overhead line "Nizhnekamsk-K-Bukash" Branch of JSC "Network Company" Nizhnekamsk Electric Networks

JSC "Kazan Thermal Grid Company"

Design and survey work on the project: "Construction of inter-district heating networks to residential buildings under construction on the Chetaev st.  № 71-3 / 16, 71-5 / 16, 71-6 / 16"  JSC "Kazan Thermal Grid Company"
Design and survey work on the project:
- "Construction of inter-district heating networks to residential buildings under construction on the Podametevskaya street with partial reconstruction of heat line №4 on the Spartakovskaya street in the area of ​​m. A (located 20m. from TK4-16 / 2 toward TK4-16 / 3) to TK4-16 / 4.
 Launch Complex №1 "Reconstruction of heat line in the area from t. A to TK4-16 / 4"
- Launch Complex №2 "Construction of the heat line of TK4-16 / 4 to the residential buildings under construction on the Podametevskaya street "
JSC "Kazan Thermal Grid Company"
Design and survey work on the project: "Construction of inter-district heating networks to residential house under construction on Dostoevskiy st., 57"   JSC "Kazan Thermal Grid Company"
Design and survey work on the project: "Construction of inter-heating networks in residential building under construction on Chetaev street, 42a, ap. 65 "  JSC "Kazan Thermal Grid Company"
Design and survey works:
1) Reconstruction of the main heat line №10 on the site of the SC-11 and SC-16 to ul.Chapaeva
2) Reconstruction of the main heat line №10 in the area from TK10-51 to TSC-9 (Simonov st., 6)
JSC "Kazan Thermal Grid Company"
Supervision of the project: "Construction of inter-heating networks to residential buildings under construction in Podametevskaya street with a partial reconstruction of heat line number 4 on the Spartakovskaya st. in the area of ​​m. A (located 20m. From TK4-16 / 2 toward TK4-16 / 3) to TK4-16 / 4 "JSC" Kazan Thermal Grid Company "

Design and survey work on the project: "The system of collection and treatment of storm water and runoff from the territory of the Northern operational district of Tetsevskaya st., 3 JSC "KTK"

JSC "Kazan Thermal Grid Company"

"Construction of heating networks in residential buildings under construction on the Podametevskaya street with partial reconstruction of heat line number 4 in the Spartakovskaya street in the area of ​​m. A (located 20m. From TK4-16 / 2 toward TK4-16 / 3) to TK4-16 / 4. Launch Complex №2 (Project № 19.103-02)

JSC "Kazan Thermal Grid Company"

JSC "TGC-16"

Complex of design (design and research) work on the implementation of design and working documentation: "Modernization of the block 7 HT with the installation of a new transformer TDC-125000-121-10,5" Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC 1)
Complex of design (design and research) work on the implementation of the project and working documentation: "The turbine unit R-100-130 / 15 st. № 6. Improvement of generator retaining rings nodes " Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC 1)
Complex of design (design and research) work on the implementation of the project and working documentation: "The turbine unit R-100-130 / 15 st. № 6. Reconstruction of overbandage seals CVP with replacement for cell ones. Modernization of oil coolers" Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC-1)
design and working documentation: "The boiler TGM-84B st.No.9 KTC-1. Modernization of PPC" Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC 1)
design and working documentation: "The steam turbine T-100-120-130 st.№10. Reconstruction of boiler unit with a jumper device on pipelines of network water (stage 2)" Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC 1)
design and working documentation: "Installing ARL 110 kV overhead line NK TPS-1 - Sidorovka 1.2" Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC 1)
design and working documentation: "The boiler TGM-84B st.№10 KTC-1. Modernization of PPC" Branch of JSC "TGC-16" Nizhnekamsk TPS (PTC 1)
"The main switchgear - 110 kV. Additional equipment of emergency control devices of overhead line -110 kV" HPP-3-Pulling "," TPS-3-Wave "and 220 kV" Kinder TPS-3 "," TPS-3 Zelenodolskaya" Branch of JSC" TGC-16 "Kazan TPS-3
Execution of design (design and research) work on the project "Replacement of switches VVN-110/6 on BHT at 110 kV (Cell #. 9.13)" Branch of JSC "TGC-16" Kazan TPS-3
Complex of design (design and research) works under the title "Steam turbine T-100 / 120-130 st. №4 generator TVF-120-2. Upgrading of condenser embedded beam " Branch of JSC "TGC-16" Kazan TPS-3

Complex of design (design and research) works under the title "The boiler TPE-430 KTC-1 st. № 5. Modernization of PPC of 1 and 2 steps, the front screen, the injection controls and continuous blowdown"
Branch of JSC "TGC-16" Kazan TPS-3
Complex of design (design and research) works under the title "Pipelines overpass on site (reinforced concrete). Modernization of heat line №15 within the Kazan TPS-3)" Branch of JSC "TGC-16" Kazan TPS-3
Main switchgear 110 kV. Construction of the bus coupler section #3,4  of switchgear 110 kV Branch of JSC "TGC-16" Kazan TPS-3
Third parties
Development of design and working documentation "Heat supply in the shopping center "Leroy Merlin Kazan" in Amirhan st." LLC "The modern energy modeling"
The scheme of power generating plants "Plant for the production of chipboard, MDF boards and DRC" in the special economic zone "Alabuga"
LLC "Kastamonu Integrated Wood Industry"

 

ООО "Кастамону интегрейтед вуд Индастри "

"Amendments to the explanatory memorandum" at the “Project” stage of the 220 kV and 110 kV overhead line NEPS CNR and Petrochemical JSC" TANECO ", by the construction phase. JSC "Taneco"
development of working documentation for the project: "The pipeline of high pressure turbine №4. Modernization of section 3 of the main steam" LLC "Nizhnekamsk TPS"
development of working documentation for the project: "Modernization of gas pipelines of boiler TGME-464 st. №4" LLC "Nizhnekamsk TPS"
Development of the working documentation for the project of JSC "KMPO": "Installing of the valves on the gas ducts from the existing gas furnaces for melting electron WRIGHT at 5 units (inv. № ES-57, № ES-60, n / n 0876511817, EP-68, № EP-69) "
JSC Kazan Motor Production Association
design documentation at stage "Project documentation" of transmission and distribution utilities, line engineering facilities, internal road network and integrated landscaping of Innovation Center "Skolkovo", and author's support. LLC "GorInzhProekt"
Engineering and geological surveys for the project: "Survey and evaluation of technical condition of constructions (TSC 7/12)"
LLC "EC" Energoprogress "
"The drilling and installation of piezometers on the right bank dam of Nizhnekamsk TPS" JSC " Russian Research Institute of Hydraulic Engineering of B.E. Vedeneev"
design work on the project "Reconstruction of 110 kV differential bus protection of substation Zelenodolskaya and differential bus protection 220 kV" LLC "Kazan Elektroproekt"
Development of design and working documentation for the project: "The backup RF channel 220 kV overhead line TPS 3 - Zelenodolskaya" LLC "PSK" EnergoSvyazStroy "
Development of project and working documentation for the project:
"1. Steam collector in the elevator;
2. 13ata steam line from the entrance to the factory to a steam collector pipe Ø 150;
3. The steam collector in bottling workshop 2;
4. The steam collector in heat point SIP BLT;
5. Steam pipeline from the heat point steam collector (SIP BLTs) to the collector of steam in the CR 2 "
JSC "Bulgarpivo"
Design work for the Kazan electrical grids
SVSESS
Engineering and geological surveys in the factory of LLC"3M-Russia" Geokorp Ltd.

 

 

The main work carried out in the period 2005-2011 years.

WORK

COMPANIES

DATE


Modernization of boiler TGM-84 "B" station №3 with the introduction of "AMAX" system

Branch of JSC "Generation Company"

Naberezhnye Chelny TPS

2011  

"Modernization of PTVM-100 boiler of st. №1 with installation of heating surfaces of a new type" - Branch of JSC" Generation Company "
Naberezhnye Chelny TPS
2011  
"Modernization of the turbine T-100-130 st. Number 7 with pipes PSG-1 a new type installation"

Branch of JSC" Generation Company"

Naberezhnye Chelny TPS

2011  
"Hydrogenerator SW 1470/149 104 V4 (№12). Modernization of the stator

Branch of JSC "Generation Company"

Nizhnekamsk TPS

2011  
Development of design and working documentation for the project: "ORU-110. Modernization of cells number 5, 6 (SDPS -Kargali 1, 2) with the introduction of HF protection and HF treatment "of the branch of JSC  Generation Company" Zainsk SDPS.

Branch of JSC "Generation Company"

Zainsk SDPS

2011  
Modernization of the flow part of the turbine of st.№12 unit with the installation of cellular seals CVP and CSD and the system of forced steam cooling RSD

Branch of JSC "Generation Company"

Zainsk SDPS

2011  
Modernization of control high-pressure cylinder valves of bl.st.№12 turbine

Branch of JSC "Generation Company"

Zainsk SDPS

2011  
"Reconstruction of heating plant"

Branch of JSC "Generation Company"

Kazan TPS-2

2011  
Design and working documentation for the project "Reconstruction of Kazan TPS-2 with installation of CCP" (Phase 1)

Branch of JSC "Generation Company"

Kazan TPS-2

2011  
"Construction of a gas pipeline from column №27 of trestle conveyor №5 to columns №55,56 overpass to the peak boiler of Kazan TPS-2"

Branch of JSC "Generation Company"

Kazan TPS-2

2011  
"Fence around the perimeter. Reconstruction of the west side of the fence"

Branch of JSC "Generation Company"

Kazan TPS-2

2011  
"The building of the main control board. Modernization of the main control board with the installation of the automatic load shedding based on microprocessor protection"

Branch of JSC "Generation Company"

Kazan TPS-2

2011  
"Main building. Boiler room. Reconstruction of walling of the fourth turn "

Branch of JSC "Generation Company"

Kazan TPS-2

2011  
Creating the scheme of electric power industry perspective development in the Republic of Tatarstan in 2011 with a view to 2016
the Ministry of Energy of RT 2011  
Development of design and working documentation for the project: "The poultry complex based on innovative resource-saving technologies. The incubatorof Naberezhnye Chelny. Construction of external power supply networks "
JSC “Agrosila Group” 2011  
Development of design and working documentation on the project: External electric power supply of "feed mill with capacity of 40 tons. per hour with simultaneous storage of 250 ths. Tons of grain" s.№1
JSC “Agrosila Group” 2011  
"The development of the stage "Working documentation" for 110 kV transmission line Nizhnekamsk - Complex, 220 kV transmission line factory - Complex, 220 kV transmission line kama500 Complex»
LLC «INVENT»
2011  
Development of design and working documentation for the 220 kV overhead line "Pismyanka-Tatstal" with VOLS
JSC "Tatstal»
2011  
"The pipeline of high pressure of turbine №2. Modernization of the second section of the main steam line. " of LLC "Nizhnekamsk TPS"
LLC "Nizhnekamsk TPS»
2011  
Development of design and working documentation for the project: The poultry complex based on innovative resource-saving technologies. Feed mill capacity of 40 tons per hour with the simultaneous storage of 250 ths. tons of grain. Area 2. Construction of external power supply networks"
JSC “Agrosila Group”
2011  
“Boiler PTVM-180 №2. Modernization of boiler PTVM-180 №2” LLC" Nizhnekamsk TPS"
LLC “Nizhnekamsk TPS”
2011  
"Creating the scheme of electric power industry perspective development of  the Republic of Tatarstan in 2011 with the prospect of up to 2016 according to the state contract 9 of 29.11.2010"
The Ministry of Energy of the Republic of Tatarstan
2011  
"Development of the scheme and the power development program of the Republic of Bashkortostan for 2012-2017" the Ministry of Industry and Innovation Policy of the Republic of Bashkortostan
2011  
Development of a preliminary feasibility study reconstruction of the emergency control system of the operational area of ​​the branch of  JSC “UES SO” RDO of Tatarstan (2 stages) .1) Running development according to the 3.6-3.10 of the technical project; 2) the transfer to the customer the exclusive right to the result of the work"
JSC “UES SO” RDO of Tatarstan 2011  
"Development of technical documentation, conceptual design of external power supply scheme (NEPS)" as part of the work for the development of conceptual design of external power supply scheme "Zainsk metallurgical complex" Halyk-Metal"  LLC «ChTPZ-Engineering» 2011  
"Development of the scheme of power unit PGU-410T, the third stage of the New Salavatskaya TPS. Basic technical solutions"
CJSC “ENERGOKOMPLEKS”
2011  
Design and detailed documentation of "Reconstruction of SS-110/10 kV" Promkomzona" of branch of JSC "Network Company " "Naberezhnye Chelny electrical grids "
Branch of JSC "Network Company" Naberezhnye Chelny electrical networks
2011  
Reconstruction of 500 kV Substation "Kinderi"
Branch of JSC "Network Company" Kazan electrical networks 2011  
Reconstruction of ORU-220 PS220 / 110/35 / 6kV "Pismyanka", "construction of the 2 chain HV-line 220 kV (cutting 220 kV" nodes Abdrakhmanov-Bugulma "the factory of the SS" Pismyanka ")
  2011  
"Upgrade of 500 kV Substation "Kinderi" with the dismantling of the existing equipment. The stage "Working documentation"
Branch of JSC "Network Company" Kazan electrical networks
2011  
Construction of "220 kV Kinderi - K. Bukash - Central suspension VOLS" Stage: Design and detailed documentation
Branch of JSC "Network Company" Kazan electrical networks
2011  
"Turbogenerator st. № 9. Modernization of the network water "  Kazan TPS-2

2010


Design and survey work on the project "EMG №2 boiler "Savinovo "
Kazan TPS-2 2010

2010


"Modernization PTVM-100 boiler of st. 2, with the installation of a new type of heating surfaces " Naberezhnye Chelny TPS

2010


Design work on the project: "Upgrade of 110 kV Substation “Kirov” Kazan electrical networks

2010


Design work on the project: "Reconstruction of ORU-220/110/35/6 kW "Pismyanka", construction of 2 chain 220 kV overhead line (220 kV cutting “nodes -Abdrahmanovo – Bugulma” calling at SS "Pismyanka" ) for power supply of  electro plant of CJSC "Tatstal"
Bugulma electrical networks

2010


Perform feasibility calculation for the project "PSU Kazan TPS-2" Kazan TPS-2

2010


Implementation of the project "Modernization of the gas distribution points (GCP Orenburg gas-1,2)"
Zainsk SDPS

2010


Upgrade of 110 kV Substation "South - Covali 1,2"
Volga Electric Networks

2009


Development of the scheme of external power supply units of "Ammonium" in Mendeleevsk
OJSC "Ammonium"

2009


External heat. Stage 2. The thermal network from node switching valves to heat points at the site of Nizhnekamsk TPS to the main steam turbine unit 140 ata and turbine №5 in the main building of Nizhnekamsk TPS (PTC-2)
Nizhnekamsk TPS (PTC-2)

2009


Development of the scheme of external power project under construction - a complex of deep processing of heavy residues PSC "TAIF - NK" in Nizhnekamsk (preproject)
JSC "TAIF-NK"

2009


Development of the scheme of external power supply steel plant JSC "Tatstal" in Leninogorsk RT
JSC "Tatstal"

2009


Modernization of water treatment equipment (translation filter chains №№2-9 on counter-chains (like Upcore)
Nizhnekamsk TPS (PTC-2)

2009


Stage - draft. GLP 1,2,3,4 110-220 / 6 kV with supply 110-220 kV power supply for the Complex
The complex of refineries and petrochemical plants of "TANECO"

2008


The project of automated control system power supply (AEAS) Complex
The complex of refineries and petrochemical plants of "TANECO"

2008


Implementation of the construction project GIS 220 and 110 kV
The complex of refineries and petrochemical plants of "TANECO"

2008


"Project" stage. Onsite electricity. Cogeneration (without RKUE).
The complex of refineries and petrochemical plants of "TANECO"

2008


"Project" stage. LEP 110-220 / 6 kV with feeding KL 220-110 kV external power supply circuit of the Complex, including the development stage "Project" special transmission 220 kV of transmission line through complex Kama across the Kama river.

The complex of refineries and petrochemical plants of "TANECO"

2008



"Project" stage. Thermal network of the border Nizhnekamsk TPS (PTC-2), including TA to the boundary of the Complex
The complex of refineries and petrochemical plants of "TANECO"

2008



Reconstruction of cooling tower №1 with translation into film type of irrigation  Naberezhnye Chelny TPS

2008



Reconstruction of cooling towers using advanced polymer construction materials
Nizhnekamsk TPS

2008



Reconstruction of cooling tower BG-1600 st.No.1 Petrozavodsk TPS, a branch of JSC "TGC-1" "Karelenergogeneratsiya"

2008


Construction of district boiler houses "Azino", "Savinovo" with boilers PTVM-180 GVGM-180 steam boiler DE-25
Kazan Thermal Network

2008


Detailed design of construction ORU-220 with two power 2x125 MVA autotransformers
Kazan TPS-3

2008


Feasibility Study "Construction of PGU-230"
Zainsk SDPS

2007-2008


Feasibility study of expansion of Kazan TPS-3, with the installation of combined-cycle plant PGU-190 Kazan TPS-3

2007-2008


Feasibility Study "Construction of two PGU-95»
Yelabuga TPS

2007-2008


SS-220/110/35 / 6kV "Abdrakhmanovo" 110 kV (2nd stage) 2nd stage design
Almetyevsk electrical networks

2007-2008


Working project "Reconstruction of 35 kV Substation" Northern "transfer to 110 kV"
Kazan TPS-2

2007-2008


Reconstruction of ORU, ZRU, etc., with the replacement of electrical equipment. Protection of modern equipment made by using microprocessor technology to replace electromechanical devices
Kazan TPS-3, Nizhnekamsk TPS, Urussu GRES, GRES Zainsk, Kazan electrical networks, electrical networks Elabuga

2007



Feasibility study "Reconstruction of Kazan TPS-1 with the creation of PSU"
Kazan TPS-1

2007


Working project "Modernization of the third stage of desalination"
Zainsk SDPS

2007


Working project "Reconstruction of GRP and gas №1,2 at Nizhnekamsk TPS (PTC 1.2) EMG №3 at Kazan TPS-3, fracturing №2 at Zainsk SDPS "
Nizhnekamsk TPS, Kazan TPS-3, Zainsk SDPS

2007


The working draft of 110/6 kV "Sidorovka"  Naberezhnye Chelny electrical networks

2007


Working project "Reconstruction of 110 kV (Cell # 5.) ZRU-6 kV" SS-15 "" Pismyanka "
Bugulma electrical networks

2007


Working project "Reconstruction of 220 kV Substation" Nizhnekamsk "110 kV" Nizhnekamsk Electric Networks

2007


Working project "Construction of 2 chain HV-line 110/35 kV" Kuchukovo-Chekalda "
Elabuga Electric Networks

2007


Project implementation inverters company «Vacon» on the network pumps
Nizhnekamsk TPS-1, Kazan TPS-3, NS № 2,5 Nizhnekamsk operational district heating networks Kazan

2006


Draft of fluid coupling "Voith" installation on nutritional and network pumps
Zainsk GRES, Naberezhnye Chelny TPS, Nizhnekamsk TPS

2005-2006


Reconstruction of PS-220/110/35/6 kW "Suleyeva" NPP "Studenets" Bugulma electrical networks

2005-2006


Group members: "TatNIPIenergoprom", Engineering Centre Energoprogress , "KER-Avtomatika", "KER-Naladka"