Power technology audit

Download file  Reference List of power technology audit

Work

Objects

 

Date


electric networks energy survey at the branch of Kirovenergo
IDGC of Center and Volga Region 2011  
Energy survey Zainsk SDPS 2011  
Energy survey Nizhnekamsk HPS 2011  
Energy survey Volga “Orgsintez” 2011  
Energy survey Chemical Plant n.a. Karpov 2011  
Testing of thermal insulation turbines and boilers of Ioshkar-Ola TPS-2 TGC-5 2011  
Thermal imaging inspection of electrical equipment TGC-6 2011  
Complex energy survey of branch enterprise of Gazprom Transgaz Kazan
JSC Gazprom 2010-2011  
Complex energy survery of Gazprom Transgaz Samara branch, Vladimir branch JSC Gazprom 2010-2011  
Complex energy survery of Gazprom Transgaz Stavropol branch JSC Gazprom 2010-2011  
Energy survey of electric networks of Kirovenergo branch IDGC of Center and Volga Region

2011г


Testing of thermal insulation turbines and boilers of Ioshkar-Ola TPS 2 TGC-5

2011г


Thermal imaging inspection of electrical equipment TGC-6

2011


Complex energy survery of enterprise branch of Gazprom Transgaz Kazan JSC Gazprom

2010-2011


Complex energy survery of Gazprom Transgaz Samara branch, Vladimir branch Gazprom

2010-2011


Complex energy survery of Gazprom Transgaz Stavropol branch
JSC Gazprom

2010-2011


Technical survey and development of technical specifications and tender documents for construction

 

AdenTPS (Republic of Yemen)

2010


Feasibility study of substitution and development of generating capacities  "MAEK Kazatomprom" (Kazakhstan)

2010


Adjustment modes HVO Nizhny Novgorod TPS TGK-6

2010


Examination of construction structures of the w / w supports 220 kV Beketovo-Ufa-South overhead line, 500kV Smelovskaya Beketovo overhead line. LLC Bashkir Grid Company

2010


Comprehensive survey of Nizhny Novgorod SDPS n.a. Vinter with consideration of upgrade options LLC "East West Capital"

2009-2010

 


Energy survey of electric parts of enterprise "Safyan" with the development of power supply circuit design of the new production, the development of energy passport JSC "Safyan"

2009-2010


Energy audit

 

JSC "TGC Urussu SDPS"

2009


Survey of SS memory
LLC "NPF ELNAP"

2009


Diagnosis of technical devices PS110 / 10/6 kV GLP-1

South Branch of

"Gazprom energy"

2009


Thermal imaging inspection of VL-500 VL-220

MES Volga "Branch of

JSC "UES FGC"

2009


Comprehensive survey of 35 kV overhead lines including: a thermal imaging survey and inspection of the technical state of the build-tive of the poles North - Caucasus branch of LLC "Gazprom energy"

2009


Installation and commissioning of heat metering LLC "Energotrans"

2009


Instrumental examination of the technical equipment TNK BP Center of Energy Saving Technologies of the Republic of Tatarstan

2009


Technical inspection of condensate "Helium plant" - "Kargalinskaya TPS"

South Ural Branch of

"Gazprom energy"

2009


Energy audit

 

 South Ural Branch of

"Gazprom energy"

2009


Upgrade of 110 kV Substation "South - Covali 1.2"
Volga Electric Networks

2009


Development of the scheme of external power supply units of "Ammonium" in Mendeleevsk OJSC "Ammonium"

2009


External heat. Stage 2. The thermal network from node switching valves to heat points at the site of Nizhnekamsk TPS to the main steam turbine unit 140 ata and №5 in the main building of Nizhnekamsk TPS (PTC-2) Nizhnekamsk TPS (PTC-2)

2009


Development of the scheme of external power project under construction - a complex of deep processing of heavy residues PSC "TAIF - NK" in Nizhnekamsk OJSC "TAIF-NK"

2009


Development of the scheme of external power supply steel plant JSC "Tatstal" in Leninogorsk RT CJSC «Tatstal"

2009


Modernization of water treatment equipment (translation filter chains №2-9 on counter-chains (like Upcore) Nizhnekamsk TPS (PTC-2)

2009


Draft stage. GLP 1,2,3,4 110-220 / 6 kV with supply 110-220 kV power supply circuit of Complex Complex of refineries and petrochemical plants of "TANECO"

2008


The project of an automated control system power supply (AEAS) Complex of Oil Refining and Petrochemical JSC "TANECO"

2008


Implementation of the construction project GIS 220 and 110 kV complex of refineries and petrochemical plants of "TANECO"

2008


"Project" stage. Onsite electricity. Cogeneration (without AMR). The complex of refineries and petrochemical plants of "TANECO"

2008


"Project" stage. LEP 110-220 / 6 kV with feeding KL 220-110 kV external power supply circuit of the Complex, including the development stage "Project" special transmission 220 kV transmission line through complex Kama across the Kama river.
The complex of refineries and petrochemical plants of "TANECO"

2008



"Project" stage. Thermal network of the border Nizhnekamsk TPS (PTC-2), including TA to the boundary of the complex The complex of refineries and petrochemical plants of "TANECO"

2008



Reconstruction of cooling tower №1 with translation into film type of irrigation Naberezhnye Chelny TPS

2008



Reconstruction of cooling towers using advanced polymer construction materials

Nizhnekamsk TPS

2008



Reconstruction of cooling tower BG-1600 Station # 1

Petrozavodsk TPS, a branch of JSC "TGC-1" "Karelenergogeneratsiya"

2008


Construction of district boiler houses "Azino", "Savinovo" with boilers PTVM-180 GVGM-180 steam boiler DE-25 Kazan heating network

2008


Detailed design of construction OSG-220 with two autotransformers power 2x125 MVA Kazan TPS-3

2008


Feasibility Study "Construction of PGC-230" Zainsk SDPS

2007-2008


Feasibility study of expansion of Kazan TPS-3, with the installation of combined-cycle plant PGC-190
Kazan TPS-3

2007-2008


Feasibility Study "Construction of two PGC-95" Yelabuga TPS

2007-2008


PS-220/110/35 / 6kV "Abdrakhmanovo" 110 kV (2nd stage) 2nd stage design Almetyevsk Electric Networks

2007-2008


Working project "Reconstruction of 35 kV Substation" Northern "transfer to 110 kV" Kazan TPS-2

2007-2008


Reconstruction of OSG, CSG, etc., with the replacement of electrical equipment. Protection of modern equipment made using microprocessor technology to replace electromechanical devices Kazan TPS-3, Nizhnekamsk TPS, Urussu SDPS, SDPS Zainsk, Kazan electrical networks, electrical networks Elabuga

2007



Feasibility study "Reconstruction of Kazan TPS-1 with creation of PGC" Kazan TPS-1

2007


Working project "Modernization of the third stage of desalination" Zainsk SDPS

2007


Working project "Reconstruction of GRP and gas №1,2 at Nizhnekamsk TPS (PTC 1.2) EMG №3 at Kazan TPS-3, fracturing №2
Zainsk SDPS" Nizhnekamsk TPS, Kazan TPS-3, TPP Zainsk

2007


The working draft of 110/6 kV "Sidorovka" Naberezhnye Chelny electrical networks

2007


Working project "Reconstruction of 110 kV (Cell # 5.) CSG-6 kV" SS-15 "" Pismyanka " Bugulma electrical networks

2007


Working project "Reconstruction of 220 kV Substation "Nizhnekamsk"110 kV" Nizhnekamsk Electric Networks

2007


Working project "Construction of 2 chain HV-line 110/35 kV" Kuchukovo-Chekalda "

Elabuga Electric Networks

2007


Project implementation inverters company «Vacon» on the network pumps Nizhnekamsk TPS-1, Kazan TPS-3, NS № 2,5 Nizhnekamsk operational district heating networks Kazan

2006


Draft Position fluid coupling firm "Foit" on supplying and network pumps Zainsk SDPS, Naberezhnye Chelny TPS, Nizhnekamsk TPS

2005-2006


Reconstruction of PS-220/110/35/6 kW "Suleyeva" NPP "Studenets" Bugulma Electric Networks

2005-2006


Group members: "TatNIPIenergoprom", Engineering Centre Energoprogress , "KER-Avtomatika", "KER-Naladka"