Zainsk SDPS
Automatic control of frequency and power of 11 power units of 200 MW (Art. № 2, 3, 4, 5, 6, 7, 8, 9, 10, 11-12) based on PTC «OVATION» EMERSON
2004-2013
SDPS-1 of Ekibastuz (Kazakhstan)
PCS 7 power units of 500 MW (Art. № 2, 3, 4, 5, 6,7,8) on the basis of PTC «OVATION» EMERSON
2005-2013

Customer and object name

Project description

Implementation period

 

Abakan TPS PCS new power unit of 125 MW

2013-2014  

Zainsk SDPS Automatic control of frequency and power of 11 power units of 200 MW (Art. № 2, 3, 4, 5, 6, 7, 8, 9, 10, 11-12) based on PTC «OVATION» EMERSON

2004-2013

SDPS-1 of Ekibastuz (Kazakhstan) PCS 7 power units of 500 MW (Art. № 2, 3, 4, 5, 6,7,8) on the basis of PTC «OVATION» EMERSON

2005-2013

Kazan TPS-2
Automated process control system for the new 220 MW CCGT

2013-2014

TPS-2 Aktau

Overhaul Systems Control Station # 2,3,13 boilers with the creation of information-measuring system

2013

Verkhny Tagil state district power station

ATS of turbine unit K-205 st.№10 based on PTC «Ovation»

2012

Novo-Kemerovo TPS Implementation of the system of automatic control, regulation and protection of the drive turbine R-3,15-1,28 / 0,2P based on PTC «PCS 7» SIEMENS

2012

Votkinsk HPS development project of higher-level control based on DCS «OVATION»
EMERSON (design and survey works)

2011-2012

TPS-2, Astana APCS 4 hot water boilers on the basis of PTC «Ovation»

2012

SDPS-2 Ekibastuz (Kazakhstan) Automated process control system for the power units of 500 MW st.№1,2 (R & D)

2011

SDPS-2 Ekibastuz (Kazakhstan) The introduction of the automatic control system of the turbogenerator and two WBC power unit st. №2 based on PTC «OVATION» EMERSON

2011

Kazan TPS- 2

Automated process control system PGU-220MVt (R & D)

2011

JSC "Nizhnekamskneftekhim "Modernization of data acquisition and transmission power plant GTU-75. Remote Control.

2011

Novo-Kemerovo HPP Implementation of the system of automatic control, regulation and protection of the drive turbine R-3,15-1,28 / 0,2P based on PTC «PCS 7» SIEMENS

2011

Nizhnekamsk TPS, PTC-1 Steam Turbine T-100-120-130 st.№10. Reconstruction of boiler unit with a device jumper on delivery water pipelines

2011

Naberezhnochelninsky Cardboard and Paper Mill Modernization of gas pipelines and boilers PCS E-160-24-250 GM Art. №1,2 and PTVM-30M (p) art. №1,2 and accessories based on PTC «PCS 7» SIEMENS (Design and survey works)

2011

Petropavlovskaya TPS-2 Automated process control system BKZ-220-100-4 st. №6 based on PTC «Ovation» EMERSON

2011

Nizhnekamsk TPS-1

Automatic ignition of burners of a boiler TGM-96B st. №14-based PTC «PCS 7» SIEMENS

2011

Priufimskaya TPS Modernization of the hydraulic control mode power boilers by adjusting the frequency of feeding pump (PEN)

2011

Almetyevsk electrical network construction and modernization of the automated systems of electric power substation "Muslumovo" SS "Aktash," SS "Suleyevo»

2011

Naberezhnye Chelny TPS Design and survey work: Upgrading the system AEAS of the station

2011

JSC "Chelnyvodokanal"
The introduction of variable frequency drive pumping units of water supply in the southwestern and northeastern parts of the city of Naberezhnye Chelny

2011

Novo-Sterlitamak TPP
TPS Kumertauskaia
Salavat TPS
Sterlitamak TPP

Installing variable frequency drive on the network pumps

2011

LLC "LUKOIL-Komi" frequency drive control system of modular cluster pumping station

2011

"LUKOIL - Western Siberia" The control system of the pumping station BPS-3
Mortymya-Teterevsky field 

2011

LLC NK "Rosneft"
Automation modular cluster pumping station Wine-field Bannovskoe

2011

Kazan TPS
building of the main control board. Modernization of the main control board with the installation of the automatic load shedding based on the  microprocessor protections

2011

The bridge over the river Vyatka at km 976 of the road M-7 "Volga" - from Moscow through Vladimir, Nizhny Novgorod, Kazan to Ufa, Republic of Tatarstan (II stage)

Construction of an integrated comprehensive system of transport security monitoring and engineering of the bridge

2011

Verkhny Tagil SDPS Creating a local warning system "turnkey"

2011

OJSC "KAMAZ"
management system of the main assembly line HSC-1

2011

Nizhnekamsk HPS Modernization of the central regulator of pressure hydraulic generators № 1-16 based on PTC «SIMATIC PCS 7» SIEMENS

 

2010

 

Aktau, TPS-2 (Kazakhstan) APCS turbine unit PT-80 st.№10 based PTC «SIMATIC» SIEMENS

2010

Smolenskaya SDPS Automatic ignition burners boiler TPE-208 unit # 3 on the basis of PTC «SIMATIC PCS 7» SIEMENS

2010

Nizhnekamsk HPS display system main control of Nizhnekamsk HPS

2010

Nizhnekamsk electric networks automated information measurement system of commercial electricity metering (AMR) PS "Nizhnekamsk" 220/110 / 10kV

 2010

Kazan electric networks automated information measurement system of commercial electricity metering (AMR) PS "Factory" 220/110 / 10kV

 2010

OJSC "KAMAZ" Development and implementation of stands the test of internal combustion engines

 2010

JSC "Naberezhnye Chelny Thermal Network Company" ACS heating Northeastern region, the South-West district of the city of Naberezhnye Chelny based software «SIMATIC WinCC» SIEMENS. The central control room.

 2009-2010

Kazan TPS-2 Development and implementation of information and measuring complex analysis of the equipment Kazan TPS-2 (turbogenerators №6,7,8,9) based on SIEMENS

 2009

Naberezhnye Chelny TPS Modernization of boiler unit st. Number 1 for the protection and alarm transfer to the microprocessor software and hardware SIEMENS

 2009

The complex of refineries and petrochemical plants of "TANECO" Automated dispatching control system vneploschadnym heat supply based on equipment SIEMENS

 2009

The bridge across the river Volga in Volgograd
Construction of the integrated system of complex safety of the bridge on the basis of «ITV»

 2009

The airport "Begishevo" Modernization fuel depot (ACS levels of tanks, gas detectors, fire alarms, ventilation) on the basis of «SIEMENS»

 2009

Nizhnekamsk TPS
Kazan TPS-2
Kazan TPS-3
Naberezhnye Chelny TPS
Zainsk SDPS
Urussu SDPS
Modernization of 23 turbine units of the automated control system of vibration diagnostics (ASKVD) on the basis of equipment "VIBROBIT"

 2007-2009

TPS-3, Aktau (Kazakhstan) Information and measuring system of temperature control and ASKVD 3 210 MW turbine generators based on PTC «OVATION» EMERSON

 2007-2009

The complex of refineries and petrochemical plants of "TANECO" ACS E of Oil Refining and Petrochemical Complex (project) based on SIEMENS equipment

 2008

Verkh-Tarskoe oil field, LLC "Novosibirskneftegaz" (TNK-BP) ACS modular gas turbine power capacity of 10.4 MW based on the equipment SIEMENS, “KER-Automation”

 2008

NGDU "Yamashneft" mobile control cabinet pumping unit based on the VFD SIEMENS and equipment "KER-Automation"

 2008

 

Priufimskaya TPS
crosslinked automatic control Station (3 energy BKZ-420 and 3 turbine generator PT-60, PT-80) on the basis of PTC «OVATION» EMERSON

 2007-2008

Zainsk SDPS
Urussu SDPS
Kazan TPS-1
Kazan TPS-2
Kazan TPS-3
Nizhnekamsk HPP
Nizhnekamsk TPS
Naberezhnye Chelny TPS
operative information complex of power stations on the basis of «SIMATIC WinCC» SIEMENS

 2007-2008

Naberezhnye Chelny TPS
automated data collection for the calculation of technical and economic indicators of the station (14 power boilers, turbine generators 11, general equipment) based equipment NPF "circle", JSC "Volmag"

 2007-2008

Kazan TPS-1
Kazan TPS-3
Nizhnekamsk TPS
Zainsk SDPS
full-scale power station automation system on the basis of the chemical shop equipment SIEMENS, “KER-Automation”

 2007-2008

 

800 CTP Moscow
Analysis of operating conditions and parameters of the equipment of more than 800 central heating units of the branches of "MIPC" (Moscow), the development of project documentation for the installation of variable frequency drive

 2007-2008

 

630 residential houses in Naberezhnye Chelny
esign and installation of automated energy accounting system (Azuero). The introduction of metering units of heat and hot water in residential buildings based on the equipment of CJSC "Rise"

 

2007-2008

"Chelny-Broiler"
Naberezhnye Chelny
Automated system of operational dispatch management of poultry processing plant based on the equipment «SIEMENS»

 2007-2008

GTU-75, JSC "Nizhnekamskneftekhim" Implementation of automated control E: Remote Control, monitoring RZA and PA, commercial metering (AMR) for the wholesale market (design, installation, commissioning) - on the basis of the equipment JSC ITF "Systems and Technologies"

 2007

Kazan TPS-1

ACS 50 MW gas turbine plant based on PTC «OVATION» EMERSON

 2005

Group members: "TatNIPIenergoprom", Engineering Centre Energoprogress , "KER-Avtomatika", "KER-Naladka"